Reading time: 2 minutes

Nestled in the heart of Mayfair, 20-22 Berkeley Square stands as a symbol of timeless elegance and prestige. This iconic building, steeped in history, is located on one of London’s most exclusive streets, less than 20 minutes walk away from Buckingham Palace.

As part of a broader vision to maintain its luxurious appeal, the client, BEAM (Berkeley Estate Asset Management), sought a commercial washroom design that would seamlessly blend sophistication with modern functionality.

Dolphin Solutions was entrusted with the task of delivering an exceptional commercial washroom experience for the 20-22 Berkeley Square washroom project that complemented the grandeur of its surroundings.

 

Washroom project brief

Dolphin Solutions collaborated with Barr Gazetas on the prestigious 20-22 Berkeley Square washroom project.

The client desired a sophisticated and upscale commercial washroom design that reflected the building’s prestige and its prime location across from the iconic Annabel’s Social Club.

The project involved integrating premium washroom fittings and special finishes to achieve an exceptional aesthetic while ensuring a seamless user experience through touch free washroom products.

 

Washroom project challenge

Given that the building was an existing structure, the 20-22 Berkeley Square washroom project presented several challenges, particularly with tight access for flushing cisterns.

Maintaining the integrity of the historic core while incorporating modern commercial washroom features required careful planning and innovative solutions.

Despite these constraints, the final result achieved a smart, high-end finish that met the client’s expectations.

 

The Dolphin Solution

To align with the commercial washroom design vision, Dolphin supplied a PVD brass finish for key washroom elements, harmonising with the light fittings from other suppliers. A contrasting black finish was chosen for additional washroom fixtures, enhancing the overall visual impact.

A key aspect of the brief was ensuring consistency between the main washroom areas and the end-of-journey facilities, including commercial showers.

The design seamlessly incorporated black finishes for the Dolphin Roseless Close Coupled Doc M WC Pack and showers, maintaining a cohesive look, while the superloo washroom fittings were finished in brass to reinforce the premium feel.

For installation efficiency and long-term maintenance, the Dolphin Strataplate was used for the commercial taps, which were wall mounted on tiled surfaces. The Strataplate wall plate kit enabled full maintenance access without the need for an unsightly access panel within the tiles, preserving the sleek washroom design.

Commercial washroom products included

  • Dolphin Electronic WC Flush Plate
  • Dolphin Inform Slimline wall mounted touch free tap
  • Dolphin Toilet Brush Set in Gold PVD
  • Dolphin robe hook in Gold PVD
  • Dolphin DS Inform Tap
  • Dolphin Roseless Combined Doc M Shower Pack

 

The washroom project result

The 20-22 Berkeley Square washroom project exemplifies sophistication and functionality, delivering a high-end experience that aligns with the prestige of the building.

The client was delighted with the result, marking another successful collaboration with Barr Gazetas and another prestigious project completed for BEAM in Mayfair.

Read more
Sector
Commercial
Location
London
Architect
Barr Gazetas


If you have any questions, please get in touch with us by filling out the form below.

Get in touch